Calcite Grinding By SCM1250, 8 TPH

Introduction

The customer wanted to produce S95 steel slag powder by adding superfine powder to the slag ground by grinding mill. The finished product would be used in superfine steel slag powder, mineral slag powder, high-strength phosphorus slag powder, composite mineral powder and cement.

Because the production base was spacious, the workshop was planned to be built after finishing equipment installation to keep the whole project going on wheels.

Design Scheme

Process

The forklift sends the materials to warehouse of material first. Then the materials would be sent by variable frequency belt feeder to the SCM1250S Mill where materials are ground. Finally, the finished products are sent to the elevator by spiral conveyor. The finished products are stored storage tank and then transported to the mixing plant to mix with steel slag to produce the building material.

Feedback from customer

Since operation six months ago, the operation of production line has been stable with yielding and fineness meeting the standards stipulated on the contracts. The intelligent control system makes operation easier. What matters is that the comprehensive after-sales service makes us free from possible problems. I feel so satisfied!

Read More

Equipment

Solution