Vertical Roller Mill-Matters Needing Attention in the Installation
In order to ensure the efficient production of the vertical roller mill, it is a prerequisite to properly install. The LM vertical roller mill is a kind of heavy equipment, and its installation has certain rules and instructions.
- 1. Put the base of the transmission device into the pit and keep it at a suitable height
- 2. Use the level to correct the upper plane "a" and fix the bolt
- 3. When installing the main engine, it is better to pad rubber shock pad at the contact between the lower plane of the base and the cement foundation
- 4. Control the position and height of the pipeline device according to the general drawing. All pipelines must be sealed well, and no air leakage is allowed after fastening
- 5. The accuracy and reliability of electrical equipment should be ensured. After the equipment is installed, it can enter the trial operation
Guaranteed correct operation in all aspects is the prerequisite for ensuring efficient production of the vertical roller mill.
Too tired to read? Try staff service!
Engineer one-to-one for you, draw up plans in time, and provide investment estimates in time!